The ceiling in my condo office cracked and collapsed last week, so now I’m looking at a large bill to get it fixed.
There is a part of me that wants to just tack up some plastic sheeting as well as not worry about fixing the ceiling.
However, a local business rep looked at the injury as well as determined that it could get a whole lot worse… Basically I am in a cucumber at the moment, because it will cost 400 bucks to repair the ceiling. I don’t have 4000 bucks, as well as don’t know how I could possibly make it quickly! On the other hand, if I don’t have the injure repaired it could eventually impact my central Heating as well as Air Conditioning system as well as my electrical grid. The concern is not with the central Heating as well as Air Conditioning system itself, it was due to poor labor by the construction team when he built this locale. The ceiling in my office was obviously done by a fool, because he secured the sheet rock to the same support holding up the Heating as well as Air Conditioning ducts. This means that eventually the rest of the ceiling could collapse, as well as bring down all of the other air ducts with it! I already need to totally upgrade the ceiling, the last expense I need is to also upgrade the Heating as well as Air Conditioning HVAC duct. But wait,it gets worse, because the concern could get even worse! Like dominos falling, once the duct system collapses it could rupture as well as injure the air handler or other vital components of my central Heating as well as Air Conditioning system. It’s hard to know one issue could lead to several other issues, but it’s true. I have a meeting with a Heating as well as Air Conditioning business later this week to discuss my opportunities for repairs, as well as to receive a price quote.